Fall Leaf Tour

Hello virtual crew members and fellow adventurers!

Eric here with the latest travels of Still Waters II.

 

IMG_0015
Skene Manor overlooking Champlain Canal in Whitehall, NY

 

 

Summary of week:

Whitehall

When it was time to leave Poughkeepsie on Tuesday, Jose had disappeared, but Hurricane Maria had taken his place.  The winds were not favorable for turning south and running down to Cape May, NJ.  So the crew continued their northbound journey on the Hudson River with a new goal of reaching Burlington, Vermont before turning south.  They have dubbed this new goal the ‘Fall Leaf Tour.’

Tuesday found them in Kingston.  Wednesday, they made a long run to Waterford to make preps for the Champlain Canal.  Thursday, they entered the Champlain Canal and stayed in Mechanicville overnight.  Friday, they moved to Ft Edwards, and Saturday they stopped in Whitehall.

This week’s journey of discovery did answer the following questions

1. Where do the tidal waters end on the Hudson River?

2. Why is there no Lock number one on the Erie Canal?

3. Why did the Erie Canal get moved to the NY Transportation Division in 2017?

Click on the link to read the day-to-day travel log.  This includes weather report of the day, sea conditions, log of the days travel, and a summary of the experience.

At the Box Office

This week’s video shows Still Waters II in Champlain Locks C-1 and C-2, where she is lifted 14 feet and 18 feet respectively.  Enjoy!

Champlain Locks C-1 & C-2 from Still Waters II on Vimeo.

To see past videos, click on the link to the Still Waters II Vimeo site.  The library now contains 38 videos of Still Waters II cruising America’s Great Loop.

Tuesday, Sept 26, 2017

The run to Kingston was uneventful except for the Man-Over-Board (MOB) drill.  This was only a drill.  The Admiral spotted something in the river that turned out to be a lifejacket.  The skipper used the lifejacket to practice their MOB skills.  I am happy to report that the lifejacket was saved without incident.  And it is a good lifejacket to boot.

The MOB drill took place just off Esopus Island near the Esopus Meadows Lighthouse.

44 Esopus Meadows Lighthouse

When the crew reached the Rondout Lighthouse, they turned up the creek and docked at the Maritime Museum.

45 Rondout Crrek Lighthouse

Since last visiting the Museum, a Wooden Boat School has been added.  The workers were busy building one boat that they plan to power with solar panels and an electric motor.  Another project was in process where the crew watched the workers bend a piece of plywood around a structure.

46 Kingston Maritime Museum

47 Kingston Wooden Boat Works

Wednesday, Sept 27, 2017

The “Fall Leaf Tour’ is off to a slow start because the temperatures have not cooled off yet.

48 Fall Color

The crew had planned to cruise about half-way to Waterford, 40 miles, and anchor out for the night.  When they arrived at the designated anchor spot at 1400, it was 90 degrees out with no breeze.  The crew decided to push on to Waterford in hopes of getting a spot on the town dock wall with electricity.

On the way, they passed two lighthouses and a Bald Eagle perched on a navigational aid.

Saugerties Lighthouse

49 Saugerties Lighthouse

Hudson City Lighthouse

50.1

51 Bald Eagle

The native Indians named the Hudson River, ‘The River That Flows Two Ways.’  The tidal water and current effect the Hudson River for 154 miles north of the Battery at the tip of Manhattan.  The tidal water ends once the river reaches the Federal Lock in Troy.

54.1

After clearing the Federal Lock, it was only three miles until the crew reached the junction of the Erie and Champlain Canal Systems.

1 Which Way to Go

Though the crew plans to take the Champlain Canal to Vermont, the crew turned left to dock at the Waterford Welcome Center at the first lock on the Erie Canal, Lock E-2.

There is no lock E-1 on the Erie Canal, which begs the question, ‘What happened to Lock E-1?  Well, in the early 1900’s New York decided to upgrade the canal system.  Part of the plan was to build E-1 at the location where the Federal Lock now sits.

After the blue prints were completed and construction was started in 1903 on other portions of the Erie Canal, it was discovered that the location for E-1 was on land and water owned by the Federal Government.  Negotiations were entered to allow New York to build and operate a lock on the Federal land.

Ultimately, it was determined that the Federal Government would build and operate the new lock.  By then it was to late to change all the blueprints and names for the other Erie Canal Locks.  The Canal System just scrubbed Lock E-1 and continued with their original plans. And that my friends is why the first lock on the NY Erie Canal was numbered E-2.

Thursday, Sept 28, 2017

While in the first lock on the Champlain Canal, C-1, the skipper struck up a conversation with the Lockmaster.  The skipper was inquiring why the locks were closing early this year.

The lockmaster commented that the Canal System had been moved to the NY Transportation Department in 2017.  As part of the change, the Canal System could now charge more money for the commercial usage of the canal.  As part of the compromise for more money, the Canal System agreed to open the recreational system later and close earlier. Yes, follow the money trail, it usually leads to the answer.  In 2017, the recreational season opened a month later than usual and is closing three weeks earlier than the past so commercial traffic can have sole use of the canals.

2 Champlain Canal

The main goal today was to move ten miles to Mechanicville and contact the Lockmaster at Lock C-3.  There is a bridge just past Lock C-3 that is only 15.5 feet of vertical clearance.  The skipper called the Lockmaster and learned that the current pool level created a vertical clearance of 17 feet 2 inches.  Unfortunately, this is not good enough.  Still Waters II requires 17 feet 6 inches of clearance.

5 Mechanicville Free Dock

The skipper got busy and took the anchor light and TV antennae down.  This resulted in lowering the vertical clearance to 15 feet 6 inches which should be good enough to squeeze under the bridge.

6 Drop Heigth

Friday, Sept 29, 2017

After clearing Lock three, it was less than a mile to the lowest bridge on the Champlain Canal.  Before leaving the lock, the skipper did ask the Lockmaster about the bridge clearance one more time.  The Lockmaster assured the skipper he had 17 feet of clearance.

IMG_0001

When they approached the bridge, the water level board read 17 feet, so the skipper slowly approached and then squeezed under the bridge.  As you can see below, there was plenty of room to spare.

7 Worried

There was some great scenery on the route to Lock C-5.  After exiting the lock, the crew approached a confusing bridge.  The Navionics, Blue Chart Garmin, and NY Canal Handbook charts all listed the bridge clearance at different heights.  The visual clearance did not look good.

IMG_0002

Once again, the skipper eased the boat up to the bridge while the Admiral climbed out on the roof of the sundeck to ensure they had enough clearance to make it under the bridge.  Just before reaching the bridge some local yelled out, ‘You have plenty of room.’  Well turns out he was right.

IMG_0006

The crew continued on to Ft Edwards Yacht Basin without any more nail bitter bridges.

IMG_0008

Saturday, Sept 30, 2017

The crew awoke to rain and cold temps.  It was only 47 degrees when the skipper woke up.  They decided to wait for the rain to stop before leaving the dock.  The skipper says he does not mind being cold, and he does not mind being wet, but he hates to be cold and wet.

After lunch the crew set out for Whitehall.  As the crew pulled into Lock C-7 the rain started back up.  Luckily it was only a light mist.  By the time they cleared the lock, the sun broke out for a while.

Lock C-8 was cleared in sunshine.  Just after exiting the lock, the skipper got a radio call from a tug Captain.  He requested the skipper to hold his position while the tug made it through a narrow shallow portion of the canal.  The tow Captain said he gets stuck in the area about half the time.  After about ten minutes, the Captain called back and said he was dragging bottom but thought he would make it through the shallow area.  He told the skipper to come on by and throw a little bit of wake.

After the tow, the skipper spotted a Bald Eagle perched in the top of a dead tree.

IMG_0010

The crew passed many farms along the canal today along with many boaters headed south.

IMG_0012

 IMG_0013

When the crew arrived at the Whitehall town dock there were already three boats tied along the wall.  There was barely any room to shoe horn a fourth boat in.  The owner of a sailboat hopped off his boat and ‘walked’ it closer to another sailboat on the wall.  This provided about 30 foot of wall space for Still Waters II to land on the wall with 15 feet of boat hanging out in the open.

IMG_0016

Since the temps are scheduled to drop in the low 30’s tonight, the Admiral was happy to be getting electricity for the heaters for the weekend.

 Boat Name of the Week

      Eggs-to-Sea

Next Week – 

The crew will continue on to Burlington, Vermont where they will turnaround and head back south.  They will need to be out of the Champlain Canal before the closure on October 11th.

Loop On – The water goes on forever and the adventure never ends.

Eric the Red

6 Comments on “Fall Leaf Tour

  1. Hey Guys. When you get to Burlington, be sure and take time to tour the Shelburne Museum. “over 150,000 works in 39 exhibition buildings”. Was there several years ago. Pres. Clinton was also hosting US Governors there right after us, so we has to rush it

    Like

  2. Ah, we passed all this on our Loop and thank you for refreshing our memories. You should try to find a way to visit the battlefield at Saratoga. We blew right by it, but it was a turning point in the Revolutionary War. If we hadn’t won at Saratoga, we might be just like Canadians now. That’s a sobering thought.

    When we were on Champlain, we visited Ticonderoga-an excellent stop-, plus Vergennes VT, Westport NY, Valcour Island, and the Lake Champlain Maritime Museum, all worthy stops. Lake Champlain is a treasure. Too bad it freezes over. I’ve gotta go back.

    We’d love to see y’all again. Let’s do the Ohio next summer.

    Liked by 1 person

    • Lived in Saratoga Springs for 2.5 years (Feb ’81 – Oct ’83) while in the Navy. Enjoyed the area and history immensely. Went to Ft Ticonderoga several times. Thanks for the heads up on possible stops. We do not have much time since the canal closes early this year, Oct 11.

      As far as Ohio River, would love to do it, but probably 2019 for us. We are going back thru Canada in 2018 to get back in the inland rivers.

      Like

  3. We loved our time on Lake Champlain: Maritime Museum, Ticonderoga, Valcour Island, and Vergennes. Enjoy!!

    Liked by 1 person

  4. The skipper says he does not mind being cold, and he does not mind being wet, but he hates to be cold and wet.

    Erik, this is a genetic thing. The Skipper’s sister is the same way!

    Liked by 1 person

Leave a reply to Mary Alice Cancel reply